BATTE Machinery China
WhatsApp: +86 158 38331071    HOT LINE: +86 371 67991755      EMAIL: info@battemachinery.com
Batte melt pump > News

Melt Pump

Screen Changer

Feeding System

melt blown progress

contact us

Batte Machinery Zhengzhou Co., Ltd.
E-mail: info@battemachinery.com
whatsapp: +86 158 38331071
Tel: +86 371 67991755
After-sales Tel: +86 371 67997677 / 67997877
Address:No.11 Changchun Road, High-tech Zone, Zhengzhou, China.

News

Details of the steps for subsequent debugging after the installation of the melt pump is completed

Zhengzhou BATTE is a professional melt pump production and manufacturing enterprise, providing melt pumps widely used in extrusion molding of plastic, resin, rubber, and chemical fiber products. After the installation and parameter setting of the melt pump are completed, the system can be put into operation. This article provides a detailed introduction to the steps and details of subsequent debugging after the installation of the melt pump.

1. Start preheating the front section, pump body, and rear section of the melt pump.

2. After the temperature of the melt pump reaches the set temperature, remove the cover of the motor fan and manually rotate the fan blades to drive the melt pump to rotate. It is normal to have no sticking points, no abnormal noise, and smooth rotation.

3. Then keep the automatic knob of the handle in manual mode.

Melt Pump

4. Set the frequency of the melt pump to around 5HZ and the host to around 3HZ. Increase the host frequency to around 0.5HZ and stop for a while, and constantly observe changes in inlet pressure.

5. When the pressure reaches the set pressure, let it stabilize for a while and then switch to automatic mode.

6. After the main machine is automatic, slowly increase the frequency of the melt pump to around 1HZ at a time until it meets the feeding requirements of the mold head.

7. During the trial operation, attention should be paid to observing the changes in various parameters. If there are any abnormalities, please turn off the automatic control status. Check and promptly eliminate the cause. In emergency situations, the emergency stop button can be pressed to stop the system.

8. Please refer to the debugging instructions for detailed usage.

Customers must pay attention to the startup sequence during actual operation: start the melt gear pump first, and then start the main motor. Shutdown sequence: First turn off the main motor, then turn off the pump.

Email: info@battemachinery.com

Whatsapp: +86 158 38331071

Previous:Application of Low Pressure and High Flow Electric Heating Melt Metering Pump
Next:PVC waterproof melt pump